BETA SITE | REPORT ISSUES / GIVE FEEDBACK

Allegheny

Long-term restrictions planned in Jefferson Hills for construction of Mon/Fayette Expressway

Julia Maruca
By Julia Maruca
1 Min Read April 19, 2023 | 3 years Ago
Go Ad-Free today

A portion of Clairton Road (Route 885) in Jefferson Hills, will be restricted to one lane periodically over the next three years, as needed, for construction of the Mon/Fayette Expressway, according to PennDOT.

The traffic impact will begin Tuesday, April 25, and last until construction of this section, 53A1, ends in October 2026.

Single-lane restrictions will take place between Sunset Drive and Miller Road.

The restrictions will not occur every day and will be in place as needed.

Crews will be building a temporary roadway in the area to get around the construction zone, where a bridge will be built over the future Mon/Fayette Expressway. Once that temporary roadway is built, the lane restrictions will occur less frequently.

The lane restrictions on Clairton Road are expected to take place between 6 a.m. and 5 p.m. Monday through Friday, but could stretch to 9 p.m. when needed. Saturday work is possible, too.

Share

Categories:

Tags:

About the Writers

Julia Maruca is a TribLive reporter covering health and the Greensburg and Hempfield areas. She joined the Trib in 2022 after working at the Butler Eagle covering southwestern Butler County. She can be reached at jmaruca@triblive.com.

Push Notifications

Get news alerts first, right in your browser.

Enable Notifications

Content you may have missed

Enjoy TribLIVE, Uninterrupted.

Support our journalism and get an ad-free experience on all your devices.

  • TribLIVE AdFree Monthly

    • Unlimited ad-free articles
    • Pay just $4.99 for your first month
  • TribLIVE AdFree Annually BEST VALUE

    • Unlimited ad-free articles
    • Billed annually, $49.99 for the first year
    • Save 50% on your first year
Get Ad-Free Access Now View other subscription options